September after the Labor Day weekend push was spent doing a number of projects that were not apparent with pictures.  Matching siding had to be ordered and took 2 weeks to arrive.

To be able to do the siding on the new addition we had to take down the siding where it ended on the old part to blend it with the old.

The front and back were each a unique project.

On the front the shutter and siding had to be removed while fighting off the big butterfly bush.

 

 

 

The back had damaged siding so it had to be removed and new installed in its place around the AC and gas lines.

 

We had to give up our work space and clean out the garage in preparation for concrete